Back to stations
METRO Gold Line
5th Street/6th Street & Minnesota
Downtown St. Paul stations are part of the METRO Gold Line project. Design is currently underway for these stations, which are planned for construction in 2022-2023. These shared stations will serve both the B Line and Gold Line. For additional detail regarding the development of these stations, see the Gold Line website at: metrotransit.org/gold-line-design-and-engineering.